Vaca Dixon Hybrid Energy Center, located in Vacaville, California, is a 50 MW simple-cycle gas turbine (CT) facility with a 57 MW/57 MWh BESS. The center has contracts with PG&E and the City of San Jose, with advanced discussions underway for a hybrid PPA. The BESS is expected to be operational by January 2027.