Henrietta Hybrid Energy Center

Henrietta Hybrid Energy Center

96 MW
battery

Henrietta Hybrid Energy Center, located in Lemoore, California, is a 96 MW simple-cycle gas turbine (CT) facility with a 99.4 MW/99.4 MWh BESS. The center operates under a long-term PPA with the City of San Jose. It shares technical features with Hanford, including fast start-up times and low turndown capability. The BESS is scheduled to start operations in January 2025.

KEY STATS:

Capacity: 96 MW (CT), 99.4 MW/99.4 MWh (BESS)
Technology: GE LM6000