Enterprise Hybrid Energy Center, located in Escondido, California, is a 50 MW simple-cycle gas turbine (CT) facility with a 52 MW/52 MWh BESS. The center operates under several contracts with San Diego Community Power. The BESS is expected to start operations in July 2026.