Border Hybrid Energy Center, located in San Diego, California, is a 49.5 MW simple-cycle gas turbine (CT) facility with a 52 MW/52 MWh BESS. The center is strategically positioned and operates under a contract with San Diego Community Power. The BESS is on track to be operational by July 2025.

KEY STATS:

Capacity: 49.5 MW (CT), 52 MW/52 MWh (BESS)
Technology: Pratt & Whitney FT8